GCID Hardening Electrical Improvements Project
The project generally includes: furnishing and installing Automatic Transfer Switches at both locations, connection of generators at both locations, and furnishing and installing instrumentation for a 300,000 gallon bolted steel storage tank.
Plans
(click to expand/collapse)
Name | Size | ||
GCID-Storage_&_Hardening _Plans_ELCTRCL_100% (1) | 10.0 MB |