GCID Hardening Electrical Improvements Project
The project generally includes: furnishing and installing Automatic Transfer Switches at both locations, connection of generators at both locations, and furnishing and installing instrumentation for a 300,000 gallon bolted steel storage tank.
Addendum 1
(click to expand/collapse)

Name | Size | |||
Addendum_01-Elec | 223.1 KB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
240531-Addendum_02-Elec | 1.2 MB |