K-7 at Weber Road
DESCRIPTION: The project generally includes constructing a new concrete control box, installing approximately 150 feet of 36-inch diameter, PVC pipe and steel fittings; connections to existing canals and pipelines, relocating two pumps, demolition/abandonment of old infrastructure, installation of valves, and appurtenances, and surface restoration. The District will furnish 36” PVC pipe, 36” steel specials and 36” couplings, see Appendix B for complete list; all other materials shall be furnished by the Contractor.
Plans
(click to expand/collapse)
Name | Size | ||
K-7 Plans 2024.07.24 | 5.8 MB |