Upper Weyand Pipeline Project

The project must be complete by March 1st, 2024. The project is located adjacent and through rural driveways and orchards approximately 1/2 mile north of Midway Road from 1/2 mile east of Batavia Road to Porter Road, near Dixon in Solano county California. The project generally includes installing approximately 1,660 feet of 48-inch diameter, DR l7 HDPE pipe and steel fittings; connections to existing pipes and installation of valve risers and access structures; demolition and removal of reinforced concrete vents and junction boxes; removal and abandonment of existing pipelines; installation of valves, and appurtenances, and surface restoration. The District has pre-purchased 48" HDPE pipe and fittings and will be furnishing an assortment of fabricated steel pipe special fittings, see Appendix g for complete list.

Status

Bidding Closed

Bid Date 10/5/23 10:00am

Company & Contacts

Solano Irrigation District
Nancy  
McWilliams

Location

Solano County, CA

ENGINEER'S ESTIMATE: $910,000.00

Contractors who were determined by the District to be pre-qualified for large diameter pipeline projects in May2022 are eligible to bid on this project. 

 Packages for new contractor prequalification closed on August 31, 2023.